Skip to content

HEALTHCARE

Healthcare mechanical contractor in Connecticut.

Hospitals, surgery centers, imaging suites, and medical office buildings. Planned around patient impact, infection control, and uptime.

Healthcare mechanical work happens in occupied buildings with active patients and non-negotiable compliance requirements. We plan ICRA precautions, phased shutdowns, and coordinated tie-ins so the rest of the floor keeps running.

Our crews are used to badge-in protocols, infection control barriers, and working inside live wards.

Medical gas piping

NFPA 99 compliant oxygen, medical air, vacuum, nitrogen, and specialty gas systems by certified med-gas installers.

Isolation & negative pressure

AII rooms and negative-pressure suites with monitoring and verification.

ORs & procedure suites

Air-change rates, filtration, and humidity control set to design intent and verified at commissioning.

Imaging support

Specialty cooling and exhaust for MRI, CT, and PET environments, including chiller redundancy.

ICRA-aware crews

Infection control risk assessment built into every phase plan, with barriers and negative-air units handled in scope.

Priority service coverage

Agreement customers get priority scheduling during business hours (Monday to Friday, 6 AM to 5 PM).

Bring us in early.

The earlier we're on a project, the more we can value-engineer, prefabricate, and de-risk the install. Let's talk specs, timeline, and budget.

Related

PROOF OF WORK

Recent healthcare projects

See all projects

Healthcare

Shaw's Cove Pediatric Specialty AC System Additions

ConnecticutHealthcare

Added cooling capacity for a pediatric specialty space with two wall-mounted AC units and a rooftop condensing unit. Included new refrigeration linesets, insulated copper drain piping, and temperature controls.

  • Commercial HVAC

Healthcare

Gaylord Hospital Imaging Rooms Duct Upgrades

Wallingford, CTHealthcare

Ductwork upgrades for renovations in two imaging rooms. Demolition of existing duct and accessories, new galvanized duct, four RGDs, duct insulation, duct cleaning, and TAB. Two phased mobilizations during normal hours.

  • Commercial HVAC
  • Sheetmetal Fabrication

Healthcare

UConn John Dempsey Hospital Wound Care Center Renovation

Farmington, CTHealthcare

Plumbing, HVAC, and medical gas systems for the Wound Care Center renovation. Demolition and reinstallation of domestic water, waste/vent, medical gas piping, galvanized ductwork, exhaust systems, hot water heating components, air devices, and insulation. New exhaust fans, reheat, louvers, and full TAB.

  • Plumbing & Piping
  • Commercial HVAC
  • Mechanical Systems
Call (860) 349-1644Request Estimate